May 2024 - July 2025
Project Engineer
Artı Endüstriyel Otomasyon Sistemleri
Istanbul, Turkey
Delivered software validation, SCADA/HMI revision, and industrial control-system work for refinery modernization and batch-production operations.
SOCAR - Heydar Aliyev Oil Refinery Modernization & Reconstruction
May 2024 - July 2025
Contributed to software validation and optimization for a large-scale refinery modernization project.
- Executed Factory Acceptance Tests for Siemens PCS7 systems.
- Improved SCADA HMI interfaces to strengthen operator situational awareness.
- Verified data integrity across field devices and control systems.
- Supported safe and reliable system deployment in a critical industrial environment.
Marsa - Margarine Line Batch Control System HMI Revision
November 2024 - April 2025
Led the redesign of SCADA HMI interfaces for a batch-production system to improve usability and operational efficiency.
- Redesigned legacy HMI screens for faster anomaly detection and a clearer operator experience.
- Simplified batch-process visualization for more precise control.
- Incorporated operator feedback to optimize production workflows.
Transferable context
Reliability-first validation, operator-centered interface design, and traceable delivery now inform how analytics and model outputs are reviewed before operational use.